RSA Projects
ROAD SAFETY AUDIT (RSA)
Safety Consultancy Services for the Rehabilitation and Upgradation to Four Lane Configuration & Strengthening of Punjab/HP Border to Sihuni from Km 11.000 to Km 51.000 (pkg-IA & IB) NH-154 in the State of Himachal Pradesh.
Safety Consultancy Services for the project of Rehabilitation and Upgradation to four lane configurations from Bhangbar to KangraBypass upto intersection with NH-154 (From Km 175.270 to km 193.400) (PKG-VB) NH-88 in the State of Himachal Pradesh on HAM.
Safety Consultant for (i) Four Laning of Takoli to Kullu section of NH-21 km 242.000 to 272.000 on EPC mode in the State of Himachal Pradesh (ii) Upgradation of Kullu-Manali section of NH-21 (new NH-03) from Km 272.00 to Km 309.345 (Designed Chainage) on EPC mode in the State of Himachal Pradesh under NHDP-IVB.
Safety Consultancy services for Four Laning of Parwanoo-Solan Section NH-22 (New NH-05) from Km 67.000 to Km 106.139, under NHDP phase-III on EPC basis in the State of Himachal Pradesh.
Safety Consultant for i) Four Laning of Solan-Kaithlighat Section of NH-22 (now NH-05) from Km. 106.139 to Km 129.050 (Design Length = 22.911 km) under NHDP Phase-III on EPC Mode in the State of Himachal Pradesh. ii) Four laning of from End of Pinjore bypass – Nalagarh section of NH 21A (Now NH-105) from Km. 4+200 to Km. 35+397 (Design Length = 31.195 km) in the state of Haryana and Himachal Pradesh on the EPC mode under Bharatmala Pariyojana.
Safety Consultant for i) Rehabilitation and Up-gradation to 4 Lane configuration & strengthening of Sihuni to Rajol from km 51.000 to km 72.000 of NH-20 (New NH-154) (Design Length = 18.450 km) of Pathankot-Mandi Section under NH (O) in HP on HAM Basis (Package-IIA). ii) Rehabilitation and Up-gradation to 2 Lane with paved shoulder configuration & strengthening of Padhar to Bijni section from km 180.000 to km 202.815 (Design Length 19.050 km) of Pathankot-Mandi under NH (O) in HP on HAM Basis (Package- VA).