Bridge/Structure Projects
BRIDGES/STRUCTURES
Design of Super Structure for construction of H.L.Bridge over Neugal Khad on Paprola to Alampur road at RD 2/770 in District Kangra Himachal Pradesh.
Consultancy services for carrying out Consultancy Services for Construction of two Lane ROB with footpath on Sheron Distributory adjoining Level Crossing 62-A on Rajpura Bathinda Railway Line at Dhuri town District Sangrur.
Construction of High-Level Bridge over River Ravi at Makoura Pattan (Approximately 900 mtr Long Bridge) including Protection work and it’s approaches in about 6.0 km. length in District Pathankot in the State of Punjab
Consultancy services for survey of the area under existing ROB in replacement of level crossing No. 145 at Sirhind to provide stair-case and structural designs of stair-case.
Feasibility Study, Soil Investigation, Preparation of GAD & DPR for construction of Integrated approaches of ROB on LC No. 89 on Rewari Bathinda Railway Line and LC No. 60 on Hisar Jakhal Road at Jindal Chowk to Surya Nagar, Hisar.
Consultancy service for Fesibilty Study DPR 4-laning of Zirakpur- Parwanoo Section of NH-5 (Old NH-22): Regarding construction of 2 Nos. flyovers on NH-22 in Pinjore Kalka Urban Complex near Burj Kotian and HMT club for proper connectivity of Sector-2,3,4&5 of Pinjore Kalka Urban Complex (RD Km. 52.530 & RD Km.56.370).
Carrying out survey and detailed designing working Drawing, detailed estimate with BOQ, Modification and site visits during construction if required for construction of H.L. bridge on Yamuna River in Village Jathlana including design of approaches and diversion, if any, on desired route by the department in Yamuna Nagar District.
Carrying out consultancy services for the preparation of GAD/Detailed Project Report/ Bid Documents for Construction of Railway over Bridge at Level Crossing C-60 on Amritsar Pathankot Railway line on Dinanagar Behrampur Galri road and its approaches in KM no. 1.00 both sides in Distt. Gurdaspur.
Consultancy services for Preparation of DPR (+) 2 No Railway over Bridge Amarpura Basti, Bhatinda at level Xing C-141/3, C-243, Ferozpur Delhi Rail Line & C-185, Bathinda Sirsa Rewari Rail Line.
Consultancy Services for preparation of DPR (1) RUB along the existing RUB Paras Ram Nagar in Bathinda. (2) ROB Janta Nagar Bathinda FZPR Rail line along Sirhind Canal in place of temporary Steel Bridge.
Carrying our Consultancy Service for Preparation of GAD/Detailed Project Report/BID Document for Construction of ROB four laned in lieu of level crossing S-148 on Jalandhar –Pathankot railway line including railway portion and approaches in about more than 1 km length on both sides (carrying our feasibility studies and suggesting minimum three alternate locations for construction of ROB in lieu of exiting level crossing and finalizing one proposal in liaison with railway /PWD) in district Pathankot and in the State of Punjab.
Appointment of Technical Consultant for Carrying our Consultancy Services for Preparation of GAD/ DPR /DNIT for Construction of RUB at Level Crossing No SPl-52/E-3 at RD 1+100 on Amritsar Pathankot railway Line on Gurdaspur-Mukerian Road in Distt Gurdaspur in the State of Punjab.
Consultancy Services for Conducting Preliminary Study, Preparation of Preliminary Report, Detailed Report etc. of Proposed 105.00 mtr. Span H.L Bridge over Markanda River
Consultancy Services for Conducting Preliminary Study, Preparation of Preliminary Report, Detailed Report etc. of Proposed 120.00mtr. Span H.L.Bridge over Majhara Khud on Banog Kheri road at RD 29/750.
Consultancy Services for Conducting Preliminary Study, Preparation of Preliminary Report, Detailed Report etc. of Proposed of H L Bridge over dehar khad (SH:- C/O 550 meter span bridge over dehar khadC/o road from Badela to Butt Bhaloon via Pharian road
Preparation of Project Report for the construction of Hawal Dehri Panalth Ghar Jarot Nagrota Surian Barial to Dehra road i.e. 1 No. H.L.Bridge (SH:C/O 800 meter span bridge over Gaj Khad at RD 10/975) in Distt Kangra (H.P) -Conducting Preliminary Study, Preparation of Preliminary Report, Detailed Report etc.
HL Bridge 20 span X-ing River Beas at Dhanoya Pattan Km. 6.5 in Distt. Gurdaspur
HL Bridge over Bata River on Kishanpura Santoshgarh road at RD 1/180 along-with both sides approaches under Paonta Division HP PWD B&R Paonta Sahib in the State of Himachal Pardesh. (Length 250 Meters)
HL Bridge over Giri River on Rampuraghat Manpur Deora road at RD 3/290 along-with both sides approaches under Paonta Division HP PWD B&R Paonta Sahib in the State of Himachal Pardesh. (Length 400 meters)
Feasibility Study of Kharar to Ludhiana Section of NH-95 starting from Km 0.450 (Kharar) to Km-76.00 (Ludhiana) in the State of Punjab on EPC-Hybrid Annuity mode. Elevated Highway 1 No. (Khammano Village) :- a) Stilted portion -1 no.( 110 span X 20 mtr. Each = 2200 mtr) b) Solid fill portion – 760 m Total Length = 2960 m (4 lane paved shoulder with divided carriage way) Flyover 8 Nos. :- a) 2 Nos.- 60 m length (6 lane, 3 span X 20m each) b) 3 Nos.- 60 m length (4 lane, 3 span X 20m each) c) 3 Nos.- 60 m length (3 lane, 3 span X 20m each)Total = 8 nos Major HL Bridge 2 Nos. :- a) 160 m long (3 Lane on LHS & 2 lane on RHS 1x10+1x42+1x25+1x58+1x25) b) 260.54 m long (6 lane) (2x46.85+4x41.71)
Consultancy Services for carrying out feasibility study Detailed Survey/Investigation, Alignment Option, Preparation of General Arrangement Drawing Engineering Report for Widening of existing H.L.Bridge at on Ditch Drain at km. Rd. 413.400 NH-10 (New NH-07) and on Sabuana Drain at km./ Rd. 418.300 on NH-10 (New NH-07) Section Fazilika Sulemanke order (Near Fazilka)
Preparation of Feasibility Study, Detailed Project Report for existing two lane plus shoulder to Four Laning of Talwandi Bhai to ferozepur section of NH-95 Km 170.00 to 194.00 in the state of Punjab. 1. Major HL Bridge I No. : 106m Long (single Span Bridge 4 Lane)
Preparation of DPR comprising of feasibility study Detailed Survey/Investigation, Alignment Option, Preparation of General arrangement Drawing , Engineering Report, Geotechnical investigations, Detailed structure design and preparation of construction drawings, cost estimation, approval from MORT&H for Construction of Proposed High level Bridge and its approaches on Rajasthan canal at KM./RD 333.700 and Sirhind Feeder at KM./RD. 333.780 on NH-10 (New NH-09) section Dabwali (Near Malout). in the State of Punjab
Appointment of Technical Consultant for carrying out consultancy services for the preparation of Preparation of General Arrangement Drawing for proposed Flyover at Km. 44.750 of Ludhiana-Sangrur Road at Junction of Malerkotla-Khanna Road (Jarg Chowk) at Malerkotla in State of Punjab
Preparation of BOQ as per specifications, calculations of quantities of various items from the available tender drawings & analysis of rate as per latest SOR/MORT&H specifications and preparation of cost estimates for Const. Of ROB in Km. No. 96 of BSBK road X-ing Bathinda-Delhi Railway L.C. No. 227-B 2. Review of available drawings and data of Railway GAD – Const. of ROB – Bathinda –Delhi Railway L.C. No. 227-B
Feasibility study, and preparation of DPR, for Construction of Proposed ROB and its approaches in existing level crossing No. B-67A Guru Nanak Pura crossing on Sahnewal-Amritsar- Rail Section at Km. 430/5-8 in Distt Jalandhar in the State of Punjab
Feasibility study and Preparation of DPR, for Construction of Proposed ROB and its Approaches on Existing Level Crossing No. S-4 at Km: 3/111.57 between Jalandhar-Jamsherkhas Stations on Jalandhar City-Nakodar Rail Section & Jalandhar -Garha Road Distt. Jalandhar in the State of Punjab
Feasibility Study, Detailed Survey, Investigations, Alignment Option, Preparation of General Arrangement Drawings, and Engineering Report for construction of proposed ROB & its approaches in replacement of existing level crossing NO.LA-54 on Bathinda-Ferozepur Rail Section at Km 381/1-2 and NH-95 (New NH-05) Section Talwandi-Ferozepur Road portion Km 198 near Ferozepur Cantt.
Consultancy Services for preparation of Feasibility and Detailed Project Report for the proposed construction of ROB on Tarn Taran Bye Pass in CJW New BG rail link from GW/SB-TTO level crossing no. A-71 km 5.916 ( Section Goindwal to Tarn Taran)
Preparation of Estimate for approaches of ROB including DPR, Feasibility Report, Layout Plan, Proposal for crossing and gradient, services roads, Drain, footpaths and detailed topographical Survey prep. of general arrangement drawings, relocation of under and over had drawings and prep. of Biding document Construction of approaches of ROB for 2x4 lane with central verge along with both footpath for Northern peripheral road from Dwarka to Kehrki Daula/ NH-8 Gurgaon on Delhi Rewari railway line between crossing no. 29-30 at junction of sector-10 and 37-D at NPR Gurgaon.
Preparation of DPR and GAD ( Land Survey, Geotechnical Investigation, Preliminary Design & Drawings, Estimation and Preparation of Bid Documents ) for construction of ROB at Level crossing No. SPL-1/299/14-15 at Bathinda at RD 287.950 crossing Delhi-Bathinda-Ferozepur railway line on NH-15
DPR for Four lane Flyover (Grade Separator) over NH-1 at ch.413+650 at Beas on Jalandhar- Amritsar Section
Consultancy Services for Feasibility Study, Preparation Study, Preparation of GAD, with its approval from concerned authorities for Flyover for improvement of Junction of NH-205 (NH-21) with proposed Ropar Bye Pass in State of Punjab.