Highway Projects
HIGHWAYS
Construction of Palchan Bye Pass to NHDL Specifications from Km 5.800 on M-S Road to Km 2.900 on Approach Road to South Portal (ARSP) under Project Rohtang Tunnel in the state of Himachal Pradesh” (Net Length 7.090 Km) on EPC mode
Construction of Nagrota Bagwan Ranital Mubarikpur road km 0/000 to 5/000 and 18/000 to 39/000 of NH 20A (NEW NH 303) in the State of H.P. (SH: -: Preparation of Detailed Project Report, Land acquisition, Forest clearance, junction design as per latest IRC codes, Hydraulic Data, GAD (General arrangement of drawings, Geo-Tech Investigation).
Consultancy Services for Preparation of DPR for new link from Bela to Panyali Connecting Ropar- Balachaur Highway including H/L Bridge over River Satluj and another bridge over Bist-Doaba Canal near Village Panyali Distt. Ropar Punjab.
Consultancy Services for Construction of Four Lane Champa-Korba-Katghora section of NH-149B from design ch. 0+000 to ch. 38+200, From NH-49 near Saragaon village to Bhaisma village) under NH(O) in the State of Chhattisgarh on Hybrid Annuity Mode:
Topographical Survey using Total Station ,soil investigation report, traffic analysis report geometric design ,Preparation of detailed project report for the road NH-154 from from km. 5.500 to 11.973 (Mamoon Chowk to Himachal Boundary) in the State of Punjab.
Consultancy Service for preparation of Feasibility-cum-DPR for 2/4 Lanning and up-gradation of existing Two lane with paved shoulder of Abohar-Sito-Gunno-Dabwali from Km 0.00 to km 53.800 NH-New in the state of Punjab.
Feasibility Study, Detailed Project Report for existing two lane plus shoulder to Four Lanning of Talwandi Bhai to Ferozepur section of NH-95 Km 170.00 to 194.00 in the state of Punjab.
Appointment of Technical Consultant for Preparation of feasibility Study & Detail Project Report of proposed road from NH-95/NH-5 Village Ramgarh to Cycle Valley at village Dhanshu
Feasibility Study of NH-95 Kharar to Ludhiana section starting from Kharar Km 0.450 to km 76.00(Ludhiana) in the state of Punjab on EPC Hybrid Annuity mode a) Design Ch. Km.10+185 to 64+400 = 54.215 kms (6 Lane) b) Design Ch. Km 64+400 to 86+199 =21.799 kms ( 4 lane)
Preparation of DPR by carrying out Total Station Survey, Geotechnical investigation and preparation of GAD, BOQ, Detailed Designing for the work of land / road development (at RD 26.00 to 29.00 of Badli Iqbalpur road MDR-136) and construction of flyover to connect residential complex and institutional campus of National Cancer Institute AIIMS including road network design and junctions at Badsha in Jhajjar District.
Preparation of DPR for improvement of road connectivity within four Lanning of Roads of Rewari Distt in NCR length 51.75 km DETAILS AS UNDER a) 4 Lanning Shahjahanpur Rewari Road upo 6km form Rewari (SH-15) b) Four Lanning Rewari Narnaul road (SH-26) c) 4 Lanning Rewari Mohindergarh road (SH) d) 4 Lanning Rewari Dadri road up to proposed by Pass(SH)
Consultancy Services for the Preparation of DPR for roads (Pkg. 2) NCR in Jhajjar distt Detail as under. a) Shalawas Amboli Bithla Dhalka SH-22 including Jatwara approach road Total Length 16.30 kms (Lane 2) b) Subana (SH-22) Sarola Ahri road Total Length 9.00 kms (2 lane) c) Jhajjar Talao Chhuchakawas Road (SH) Total Length 14.0 kms (2 lane) d) Gawalison (VT) Kheri Hosdarpur Karodha Raiya (SH-22) Salidha Gijrodh (NH-71) Total Length 15.30 kms (2 lane).
Preparation for Project reports for construction of roads/HLB in District SAS Nagar construction of 200’ wide road Approx. 6.5 km length from the junction point of sector82/82A/66B upto NH-64 meeting near Chhatt at SAS Nagar.
Consultancy Services for the Preparation of DPR for roads (NCRPB) in Gurgaon distt. (2/4 lane) a) Patodi- Khendewal b) Wazipur – Faruknagar c) Hayatpur - Bangrula
Feasibility Study of proposed Mohali Expressway from Baddi to Lalru from Km 66.
Feasibility Study for Preparation of Detailed project report for Mohali - Phagwara Expressway from km 106.
Feasibility Study for preparation of 4 lane from Chandigarh to Anandpur Expressway (Section Chandigarh-Mullanpur-Siswan Kurali Road in SAS Nagar)
Upgradation to 4 Lanes with Paved Shoulder of Jammu-Aknoor road section of NH-144A from canal head (km 000-800th) to Ganesh Vihar (Km 6.000th) of 5.2 km length in the state of Jammu & Kashmir.